Monday - Saturday
9am - 5pm

62122 N. 9th St.
Slidell, LA 70460

Beverage Destruction Service

Beverage Destruction Service

Many governments have established strategies to help with food waste management to curb the volumes of waste in landfills. The private and public sectors have started thousands of initiatives to improve waste management and cut down on waste from unsold items, surplus food, and waste disposal from the consumed products.

Food waste accounts for a third of the world’s total and has a rough total estimate of $9 billion. 40% of this waste makes it to the recycling system, but the rest is lost in the environment and has the potential to cause harm to the land and water. Today, we will look at the most critical fundamentals of food waste management and how a food and beverage waste destruction service can make things better.

What Is Food Waste Management?

Food waste management is the strategy used to reduce waste even before it occurs and after consuming it. These sustainable strategies have an improved impact on the economic standpoint because they can help companies, businesses and individuals cut down on excessive production. The numbers collected from our waste management process also help reduce loss of transport, improve harvesting, and improve perishability conditions.

Types Of Beverage Recycling Services

Managing waste from food products is about diversifying the methods and helping to make a more sustainable business and better environment. The following are some significant ways of managing beverage destruction.

Major Types Of Food And Beverage Waste Services

Gathering Logistics

The most effective way of waste management is to refuse to produce massive amounts of waste in the production phase. The correlation between the numbers you produce and the amount of waste will help you determine how much waste you are dumping into the environment.

An example is that a company that manufactures food products for charity can produce too much of it that the distributors or consumers throw some of it away. Foods that expire quickly can fill up the waste bin fast, so you must make sure you are closely looking at the production and keeping the numbers within the correct range.

Reduce The Extra Waste

How much plastic do you need for your food and beverage production? Non-recyclable or non-biological materials have the most toxic effect on the environment, and you want to make sure you reduce them to reduce their hazardous impact. Some companies can use our information to cut down on the production cost, such as printing on the container or both sides of the sticker on the package.

Reusability

Businesses are finding new ways to reduce toxic waste by using biodegradable materials and products. We focus on how you can implement better ways by looking at the waste you produce over a long period.

Knowing how to recycle materials makes it easy for you to focus on implementing a system that will upcycle environmental conservatism. Get started with us by booking a personal consultation with Sledgehammer Product Destruction so that our team can start a comprehensive plan for your packaged food and beverage destruction services.

Beverage Destruction Service
Sledgehammer Product Destruction
562-210-0075
Beverage Destruction Service
9400 Hall Rd
Downey CA 9024

View Larger Map

We welcome your comments!

Our Services Include...

  • Asphalt – Parking Lots & Driveways
  • Re-Surfacing
  • Patching
  • Replacing
  • Sealcoating
  • Crack Repair
  • Parking Lot Striping
  • Signage
  • Concrete – Dumpster Pads / Sidewalks / Aprons
  • Maintenance Programs
  • Drain Repair
  • Parking Bumpers
Asphalt Solutions LLC
62122 N. 9th St.
Slidell, LA 70460

985-788-0493

Monday - Saturday
9am - 5pm

Map & Directions