Monday - Saturday
9am - 5pm

62122 N. 9th St.
Slidell, LA 70460

Orlando Solar Pool Heaters

Save on heating costs when you use an Orlando solar pool heater.

Discover a range of Orlando solar pool heaters at Everything 4 Pools And Solar. Arrange an appointment with us to learn more about our pool heaters. Be sure to check out our selection of pool equipment, too.

There are many benefits to using Orlando solar pool heaters especially if you want to save energy while cutting down your carbon emissions. These types of heaters rely on solar panels to transfer the sun's heat to your swimming pool. For maximum efficiency, the solar panels are installed in an area where they can get the most sunlight, like on your roof.

How it Works

To heat the water, the swimming pool pump pushes the water through a circulation system into the solar panels. Having a solar heater can help reduce energy costs. Sun powered heaters are relatively inexpensive to operate, too—you never have to pay monthly operating costs. And because they do not emit air pollution and rely on a renewable energy source, solar heaters are considered environmentally friendly. A high-quality solar pool heater should last between 15 to 20 years.

Tips for Using a Solar Pool Heater

Before buying a solar heater, you need to consider having an auxiliary heater for cloudy days and nights. If you think you will be using the pool later during the day, consider turning the solar heater on ahead of time—like in the morning—so that by the time you are ready to swim, the water is warm enough.

Everything 4 Pools and Solar can tell you more about Orlando solar pool heaters. We are a dealer of FAFCO solar pool heaters in Central Florida. Our solar pool heaters have over 24 US patents are some of the best in the world. We can repair, replace, and service solar pool heaters, too. Call us or leave a message in this website. Everything 4 Pools and Solar is accredited by the Better Business Bureau.

Everything 4 Pools and Solar
407 927 0652
Orlando Solar Pool Heaters
973 Shadick Dr
Orange City FL 32763

View Larger Map

We welcome your comments!

Our Services Include...

  • Asphalt – Parking Lots & Driveways
  • Re-Surfacing
  • Patching
  • Replacing
  • Sealcoating
  • Crack Repair
  • Parking Lot Striping
  • Signage
  • Concrete – Dumpster Pads / Sidewalks / Aprons
  • Maintenance Programs
  • Drain Repair
  • Parking Bumpers
Asphalt Solutions LLC
62122 N. 9th St.
Slidell, LA 70460

985-788-0493

Monday - Saturday
9am - 5pm

Map & Directions