Monday - Saturday
9am - 5pm

62122 N. 9th St.
Slidell, LA 70460

Takeuchi Construction Equipment

Takeuchi Construction Equipment

5 Tips On Purchasing Used Takeuchi Construction Equipment

There are a number of businesses that would rather purchase new construction equipment and this is understandable. On the other hand, businesses that are in the market for Takeuchi construction equipment may decide that they would rather purchase a used model. There are several reasons to make such a decision.

We are not here to discuss those, though. We are here to provide a useful guide for purchasing used Takeuchi construction equipment so that we can avoid the types of issues that tend to take place in these scenarios. Here are some points to bear in mind before purchasing used Takeuchi construction equipment.

1) Knowing Our Own Requirements

Buyers would be stunned to learn about the sheer number of people who are completely unaware of the fact that they will need to know their own requirements. While the seller is able to guide us in a certain direction if needed, there is something to be said for doing our own homework ahead of time. Don't make any assumption that the equipment seller is going to be able to assist if we do not know our own requirements ahead of time.

2) Inspection of the History

The history of the equipment is also something that needs to be considered. Make sure that there are not any liens that have been placed against the equipment. We are also going to need to take a closer look to make sure that the equipment has not been stolen. If the title of the equipment is compromised in any way, true ownership cannot be offered and this is something that could potentially come back to haunt us.

3) Take a Closer Look At The Fluids

There are a few different fluids that need to be analyzed before we are able to take a piece of used Takeuchi construction equipment home and enjoy the proper peace of mind. For starters, we must check the engine oil and the transmission fluid before making a final decision. By taking a closer look at the fluids, we are able to develop a stronger level of understanding as to how well the product has been maintained over the course of its life span.

4) Knowing The Hours of Operation

The hours of operation play a major role in our decision making. Be sure to check the equipment to find out more about how much it has been used. Every piece of used construction equipment is not created equally. Obviously, a piece of used construction equipment that has a great deal of wear and tear is not going to be in our best interests. We should be aiming to purchase a used piece of construction equipment that has a low number of operational hours under its belt.

5) Accuracy

Some equipment may not be accurate and this is the sort of issue that is better off being explored before we make the purchase. If the equipment involves some form of scaling, we will need to make sure that that these scales are performing at a full level of accuracy before any decisions are made.

 

Takeuchi Compact Track Loader General Service Information

Misplaced your owner’s manual and not certain of the maintenance intervals for your Takeuchi Track loader? Below is an overview of the intervals and lubricant specs for your reference.    Maintenance of your Takeuchi Track Loader is of paramount importance in keeping it running for many years with no serious issues.    Overview of service intervals on Takeuchi Track Loaders:   Tip: Never mix brands of oil, if a new brand is to be introduced, drain and replace completely.   Engine Oil: ...

Takeuchi has come out with its TB250-2 compact excavator

This machine is a 5-ton excavator at 10,957 pounds that is designed for a wide variety of tasks which include: landscaping, general contracting, and rental. The standard long arm has a dig depth of 12’ 4.8” to just over 20’ max reach with an integrated thumb mount. Its 39 horsepower engine is EPA Final Tier 4 Emission Compliant and provides excellent access to all daily service points. TB250-2 compact excavator´s main auxiliary circuit provides over 24gpm, includes ...
ACT Construction Equipment
7043237934
Takeuchi Construction Equipment
10925 Metromont Pkwy
Charlotte NC 28269

View Larger Map

We welcome your comments!

Our Services Include...

  • Asphalt – Parking Lots & Driveways
  • Re-Surfacing
  • Patching
  • Replacing
  • Sealcoating
  • Crack Repair
  • Parking Lot Striping
  • Signage
  • Concrete – Dumpster Pads / Sidewalks / Aprons
  • Maintenance Programs
  • Drain Repair
  • Parking Bumpers
Asphalt Solutions LLC
62122 N. 9th St.
Slidell, LA 70460

985-788-0493

Monday - Saturday
9am - 5pm

Map & Directions